DOC Whites Bay Wastewater Management

Client :
  Department of Conservations - South Marlborough.

Engineer :
  Dave Kirk - Aspire Wastewater Ecosystems Ltd.

Contract Manager :
  Sarah Boulton.

Completed Value :
  $ 421,331.

Start Date :
  September 2010.

Practical Completion Date :
  October 2010.

Overview :
Construction of a full upgrade to wastewater treatment facilities at Whites Bay, Marlborough.

Specific Scope :
  - Clearance and disposal of vegetation.
  - Installation of 6 x 15,900 litre concrete sewage tanks.
  - Construction of a 'Wisconsin Mound'.
  - Construction of all associated gravity and pressure pipelines for treatment system.
  - Electrical and telemetry for treatment process design and build.
  - Solar power system with emergency generator back up design and build.
  - Surface and subsurface drainage.

TDC Rabbit Island Wastewater Management

Client :
  Tasman District Council.

Engineer :
  Dave Kirk - Aspire Wastewater Ecosystems Ltd.

Contract Manager :
  Sarah Boulton.

Completed Value :
  $ 201,034.

Start Date :
  October 2010.

Practical Completion Date :
  November 2010.

Overview :
Construction of a full upgrade to wastewater treatment facilities at three existing toilet blocks located at Rabbit Island, Tasman District.

Specific Scope :
  - Clearance and disposal of vegetation.
  - Installation of underground concrete sewage tanks.
  - Construction of a 'Wisconsin Mounds'.
  - Construction of all associated gravity and pressure pipelines for treatment system.
  - Electrical system for treatment process design and build.
  - Solar power systems design and build.

TDC Otuwhero Spit - Marahau.

Client :
  Tasman District Council.

Engineer :
  Ching Contracting (Tony Munnerley). For TDC Francie Wafer.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 32,255.70.

Start Date :
  August 2010.

Practical Completion Date :
  August 2010.

Overview :
Design, consent and build of a replacement full containment toilet facility at Otuwhero Spit, Marahau.

Specific Scope :
  - Design of new toilet installation for consent applications.
  - Obtain Building Consent for works.
  - Obtain Resource Consent for works.
  - Empty and remove existing containment toilet.
  - Supply and install new 10,000 litre alloy containment tank with anti-flotation provisions.
  - Install two new Norski wilderness toilet units on containment tank.
  - Consult and co-ordinate with Iwi for on site monitoring of excavations.
  - Obtain code of compliance.

DOC Molesworth Containment Toilets.

Client :
  Department of Conservation (Sth Marlborough).

Engineer :
  Ching Contracting (Tony Munnerley). For DOC Jim Herdman.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 20,918.10.

Start Date :
  August 2009.

Practical Completion Date :
  September 2009.

Overview :
Design and build of new containment toilet facilities at three sites located in the Molesworth Station.

Specific Scope :
  - Design of new toilet installations for consent applications.
  - Obtain Building Consent for works from Marlborough District Council and Hurunui District Council.
  - Obtain Resource Consent for works from Marlborough District Council and Hurunui District Council.
  - Supply and install new 1000 litre concrete containment tanks at each location.
  - Construct and Install prefabricated timber platforms for each containment tank to seal off and for mounting toilet units.
  - Install new Norski wilderness toilet unit to timber platform on each containment tank.
  - Consult and co-ordinate with District Council building inspectors for final inspections.
  - Obtain code of compliance certificates for each site.

DOC Flora Carpark & Flora Hut Toilets.

Client :
  Department of Conservation (Motueka).

Engineer :
  Tom Young.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 14,784.90.

Start Date :
  September 2009.

Practical Completion Date :
  September 2009.

Overview :
Preliminary design and build of two new containment toilet facilities at Flora Carprk and Flora Hut, Mt Arthur, Tasman.

Specific Scope :
  - Preliminary design and plan drawing for Department of Conservation.
  - Construction of new fully accessible toilet unit on 9000 litre concrete containment tank at Flora Carpark.
  - Construct concrete wheelchair access ramp to fully accessible toilet unit.
  - Construction of refurbished 'character' toilet unit on 5000 litre concrete containment tank at Flora Hut.

DOC Mt Robert Carpark Toilet.

Client :
  Department of Conservation (Nelson Lakes).

Engineer :
  Ching Contracting (Tony Munnerley). For DOC Greg Carter.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 8906.00.

Start Date :
  July 2009.

Practical Completion Date :
  July 2009.

Overview :
Design and build of new fully accessible, full containment toilet facility at the Mt Robert carpark, Nelson Lakes.

Specific Scope :
  - Design of new toilet installation for building consent application.
  - Obtain Building Consent for works.
  - Supply and install new 9,000 litre concrete containment tank.
  - Install new fully accessible Norski toilet unit on containment tank.
  - Construct concrete wheelchair access ramp to fully accessible toilet unit.
  - Obtain code of compliance.

DOC West Bay, Kawatiri Junction and Maruia Falls Toilets.

Client :
  Department of Conservation (Nelson Lakes).

Engineer :
  Ching Contracting (Steffan Eden). For DOC Greg Carter.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 28,855.50.

Start Date :
  December 2008.

Practical Completion Date :
  July 2009.

Overview :
Design and build of three new fully accessible toilet facilities at three separate locations around the Nelson Lakes area.

Specific Scope :
  - Design of new toilet installation for building consent application at each site.
  - Obtain Building Consent for each site.
  - Supply and install new 9,000 litre concrete containment tank.
  - Install new fully accessible Norski toilet unit on containment tank.
  - Construct concrete wheelchair access ramp to fully accessible toilet unit.
  - Obtain code of compliance.