NCC Tasman Street Upgrade.

Client :
  Nelson City Council.

Engineer :
  Velenjani Dube.

Contract Manager :
  Mark Barr.

Completed Value :
  $ 566,608.30

Start Date :
  September 2013.

Practical Completion Date :
  December 2013.

Overview :
Full road reconstruction of Tasman Street between Cambria and Grove Street including new stormwater and sewer reticulation.

Specific Scope :
  - Installation of 120m of 450diaRCRRJ and 50m of 300dia RCRRJ Stormwater pipe with manholes and new sumps.
  - Relaying of 190m of 150dia PVC Sewer pipe at depths up to 3m including lateral replacement to existing properties.
  - Replacement of 36m of existing 400dia AC watermain with new 450dia CLS and connections.
  - Cut to waste of 800m3 of existing carriageway.
  - Laying of 600m3 of new pavement layers.
  - 400m of new kerb and channel.
  - 900m2 of new AC footpaths and driveways.
  - 1500m2 of 2 Coat Chip Seal.
  - 1600m2 of Geogrid within new pavement layers.
  - 369m2 of new grass berms and plantings.
  - Installation of new Street Lighting.

TDC Talbot Street / Salisbury Road Traffic Signals.

Client :
  Tasman District Council.

Engineer :
  MWH.

Contract Manager :
  Mark Barr.

Completed Value :
  $ 897,105.68.

Start Date :
  April 2009.

Practical Completion Date :
  October 2009.

Overview :
Roading and associated infrastructure upgrade of the Salisbury Rd / Talbot Street intersection in Richmond including installation of new traffic signals.

Specific Scope :
  - Stormwater pipeline relay - 100Ø to 450Ø and associated manholes and sumps.
  - Watermain relay - 63Ø to 150Ø and service laterals. Pressure testing and connection to TDC reticulation.
  - Installation of new traffic signals.
  - Saw cutting and cut to waste of existing pavement and kerb lines.
  - Kerb & channel and footpath construction including laying of pavers and tactile pavers.
  - New road pavement construction and surfacing.
  - Landscaping and street furniture.
  - Road marking and signage.
  - Temporary traffic management on busy Richmond road located in multiple school zone.

NCC Tasman Street Upgrade

Client :
  Nelson City Council.

Engineer :
  Drew Hayes.

Contract Manager :
  Scott Brookland.

Completed Value :
  $ 204,162.

Start Date :
  February 2009.

Practical Completion Date :
  April 2009.

Overview :
Completion of a stormwater and roading upgrade of Tasman St in the Nelson city area.

Specific Scope :
  - Installation of 109m of 300mm diameter concrete stormwater pipeline.
  - Installation of 23m of 225mm diameter concrete stormwater pipeline.
  - Installation of associated stormwater sumps and manhole structures.
  - Excavation of 643m³ of cut to waste.
  - Construction of 260m of mountable kerb and channel.
  - Construction of 550m² of asphaltic concrete footpaths.
  - Construction of 342m of timber edging.
  - Placement and compaction of 573m³ of granular pavements (AP65 and AP40).
  - Construction of 1425m² of 2 coat chipseal.
  - Construction of 1425m² of 2 coat chipseal.
  - Construction of 400m² of grass berms.
  - Road Marking.
  - Landscaping.
  - Temporary traffic management.