Stanley Crescent Stormwater Stage 2

Client :
  Nelson City Council.

Engineer :
  Velenjani Dube.

Contract Manager :
  Jason Routledge.

Completed Value :
  $ 199,916.00

Start Date :
  November 2015.

Practical Completion Date :
  December 2015.

Overview :
Construction of new Stormwater reticulation from Stanley Crescent down to Haven Road in Nelson city.

Specific Scope :
  - Install new 300dia RCRRJ pipe, sumps and manholes in Stanley Crescent.
  - Supply, weld and install 120m of 350 OD PE100 SDR17 by means of directional drill down a 45 degree slope from Stanley Crescent to Haven Road.
  - Install new 300dia RCRRJ pipe through private property.
  - Reinstatement in private property and NCC carriageways.
  - Works within a hail site and handling contaminated material.

TDC Ruby Bay Stormwater Upgrade

Client :
  Tasman District Council.

Engineer :
  OPUS - Martin Crundwell.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 430,926.

Start Date :
  October 2011.

Practical Completion Date :
  December 2011.

Overview :
Construction of a new 600Ø stormwater pipeline and outfall structure to increase stormwater capacity in the Ruby Bay area.

Specific Scope :
  - Realignment of 25m of 200Ø watermain.
  - Construct, test and commission 76m of new 150Ø uPVC sewer pipeline.
  - Construct, test and commission 35m of new 100Ø uPVC sewer pipeline.
  - Construct and test 4 x 1050Ø sewer manholes.
  - Construct and pressure test 160m of 600Ø marine grade concrete stormwater pipeline.
  - Construct 3.06m dia SW junction chamber with Tidesaver NRV's.
  - Construct 18m of 675Ø Class 4 outfall pipeline through existing sea wall. Reinstatement and rock work.
  - Construct timber boardwalk for public beach access.
  - Dewatering of all trenchlines using well points and silt control container.
  - All work completed to requirements of two resource consents. Iwi monitor on site during all excavation work.

TDC Motueka Stormwater and Sewer Improvements

Client :
  Tasman District Council.

Engineer :
  MWH - James Tomkinson.

Contract Manager :
  Mark Barr.

Completed Value :
  $ 877,912.

Start Date :
  May 2011.

Practical Completion Date :
  August 2011.

Overview :
Replacement and installation of new stormwater and sewer gravity pipelines in High Street, Motueka and several adjoining streets.

Specific Scope :
  - Replacement of 610m of RCRRJ stormwater pipes from 750Ø to 300Ø.
  - Install associated stormwater manholes and sumps.
  - Renewal of 290m of 150Ø gravity sewer pipelines in various streets.
  - Pipe bursting of replacement sewer laterals from new main to property boundaries.
  - Air testing of all new pipelines.
  - Complex traffic management on state highway with multiple side streets.

NCC Seymour Ave Upgrade

Client :
  Nelson City Council.

Engineer :
  NCC - Alec Louverdis.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 342,494.

Start Date :
  April 2011.

Practical Completion Date :
  July 2011.

Overview :
As a subcontractor to Fulton Hogan, completed construction of new gravity stormwater pipelines, watermain construction and installation of telecom and power service ducts.

Specific Scope :
  - Supply and installation of 530m of RCRRJ stormwater pipelines from 900Ø to 225Ø.
  - Construct 12 stormwater manholes from 1050Ø to 1800Ø and 18 sumps.
  - Supply and install 340m of DN63 watermain and 21 residential service connections.
  - Install 325m of telecom service ducts and 120m of twin power ducts.
  - Supply and install 47m of new 150Ø gravity sewer and associated lateral connections.
  - Pressure testing and commissioning of watermains.

NCC Weka Street Stormwater and Sewer Upgrade

Client :
  Nelson City Council.

Engineer :
  NCC - Alec Louverdis.

Contract Manager :
  Mark Barr.

Completed Value :
  $ 797,980.

Start Date :
  February 2011.

Practical Completion Date :
  May 2011.

Overview :
Major upgrade of gravity stormwater and sewer reticulation along Weka Street, Nelson City, between Tasman Street and Collingwood Street.

Specific Scope :
  - Install 410m of RCRRL stormwater pipelines from 1200Ø to 225Ø.
  - Install associated new stormwater manholes and sumps.
  - Renew existing 225Ø gravity sewer with new 300Ø pipe.
  - Install new sewer manholes.
  - Replace existing sewer laterals to boundaries and install inspection points.
  - Install steel watermain specials.
  - Construct new kerb & channel and traffic islands.
  - Carriageway reinstatement.
  - Temporary traffic management and liaison with residents.

CRT Siteworks & Northern Road Upgrade

Client :
  Network Tasman Ltd.

Engineer :
  Land Dimensions Ltd - Raymond Gibbins.

Contract Manager :
  Tony Munnerley.

Completed Value :
  $ 538,112.66.

Start Date :
  March 2010.

Practical Completion Date :
  July 2010.

Overview :
Construction of new yard area as part of development of new trading premises for CRT in Nelson.
Upgrade of the access road servicing the new CRT yard site and existing tennants of Network Tasman Ltd.

Specific Scope :
  - As head contractor on this project, management and co-ordination of major roading subcontractor, Fulton hogan Ltd.
  - Construction of new stormwater, sewer and water reticulation for the new building and yard development.
  - Construction of new spill containment facilities for the yard area comprising of 2000 litre underground chamber, valving and pipe work.
  - Bulk earthworks, metalcourse construction, chipsealing and asphalt surfacing of the new yard area.
  - Liaison and working along side power, telecom, landscaping and fencing subcontractors employed directly by the client.
  - Concrete kerbing and footpath construction.
  - Construction of 125m of new 825Ø and 675Ø reinforced concrete stormwater pipelines and associated manhole and sump structures as part of the Northern Road access upgrade.
  - Realignment, deepening, testing, disinfection and commissioning of the existing 150Ø uPVC watermain in the access road.

TDC Old Wharf Road Stormwater Renewal

Client :
  Tasman District Council.

Engineer :
  MWH.

Contract Manager :
  Scott Brookland.

Completed Value :
  $ 180,242.70.

Start Date :
  April 2010.

Practical Completion Date :
  June 2010.

Overview :
Stormwater pipeline upgrade (750Ø and 825Ø) in Old Wharf Road, Motueka.

Specific Scope :
  - Install approx. 90m of 750Ø RCRRJ Duracem pipes.
  - Install approx. 80m of 825Ø RCRRJ Duracem pipes.
  - Construct outlet into Woodland Drain.
  - Construct stormwater manholes, sumps and sump leads.
  - Survey setout and as-builting.
  - Temporary traffic management.
  - Compliance with Resource Consent conditions.

NCC Stanley Crescent Stormwater Upgrades - Stages I & II.

Client :
  Nelson City Council.

Engineer :
  Josh Large / Drew Hayes.

Contract Manager :
  Sarah Boulton.

Completed Value :
  $ 255,756.02.

Start Date :
  January 2010.

Practical Completion Date :
  June 2010.

Overview :
Construction of a stormwater reticulation upgrade to Stanley Cresent, Nelson city, completed over two separate stages.

Specific Scope :
  - Supply and installation of 70m of 225Ø RCRRJ pipes.
  - Supply and installation of 259m of 300Ø RCRRJ pipes.
  - Supply and installation of 94m of 375Ø RCRRJ pipes.
  - Construction of 14 x 1050Ø stormwater manholes.
  - Construction of 7 back entry sumps.
  - Construction of 2 standard sumps.
  - Realignment of a section of 40Ø watermain to remove clash with new SW pipelines, including testing and commissioning.
  - Residential driveway reinstatement.
  - Reinstatement of grass berms.
  - Releveling of existing services covers.
  - Temporary traffic management and liaison with residents throughout the contract.

TDC Kingsley Place Stormwater Upgrade.

Client :
  Tasman District Council.

Engineer :
  MWH.

Contract Manager :
  Scott Brookland.

Completed Value :
  $ 305,375.56.

Start Date :
  April 2009.

Practical Completion Date :
  June 2009.

Overview :
Construction of new stormwater pipelines and structures Kingsley Place, Richmond.

Specific Scope :
  - Supply and lay 92m of 750Ø Class 2 concrete pipes up to 2.5m deep in carriageway.
  - Supply and lay 37m of 525Ø Class 2 concrete pipes up to 3.5m deep in carriageway.
  - Supply and lay 9m of 375Ø sump leads in carriageway.
  - Supply and lay 18m of 225Ø sump leads in carriageway.
  - Supply and lay 59m of 675Ø Class 2 concrete pipes up to 2.5m deep in berms and private property.
  - Supply and lay 61m of 600Ø Class 2 concrete pipes up to 3.6m deep in berms and private property.
  - Construct 15 x 1350Ø stormwater manholes up to 3.6m deep.
  - Construct 4 double sumps.
  - Reinstatement of private driveways and landscaping.
  - Reinstatement in Kingsley Place carriageway.
  - Temporary traffic management.
  - Liaison with landowners.

TDC Upper Gibbs Road Stormwater Upgrade.

Client :
  Tasman District Council.

Engineer :
  MWH.

Contract Manager :
  Scott Brookland.

Completed Value :
  $ 197,834.05.

Start Date :
  July 2009.

Practical Completion Date :
  September 2009.

Overview :
Construction of new stormwater pipelines and structures in Upper Gibbs Road, Collingwood, Golden Bay.

Specific Scope :
  - Supply and lay 112.5m of 750Ø Class 2 and 3 concrete pipes up to 4m deep.
  - Supply and lay 64.9m of 675Ø Class 2 and 3 concrete pipes up to 3m deep.
  - Supply and lay 4.2m of 450Ø Class 3 concrete pipes up to 1.5m deep.
  - Supply and lay 4.3m of 375Ø Class 3 concrete pipes up to 1.5m deep.
  - Construct 5 x 1350Ø stormwater manholes up to 4m deep.
  - Supply and install 3 precast headwall structures and associated rock protection.
  - Regrade 60m of existing stormwater channel.
  - Temporary traffic management.
  - Liaison with landowners.